Whether you need more information or are ready to apply, you can find what you need here. To view these files, you need Adobe Acrobat Reader. You can download the latest version for free at this link.
The New York State Public Service Commission (PSC) has a section of their Web site dedicated to distributed generation projects. You can click here to access PSC information and resources.
Select the appropriate form(s) below for your distributed generation project
| Distributed Generation Project Size and Status |
Required Forms |
| 1. If your site requires new or upgraded electric service |
Application for electric service |
|
2 a. If you are installing a system that will generate 25 kw or less you can apply online or download this form.
Remember to include the following information with your application:
- A letter of authorization by the customer (if you are
acting as an agent for the customer),
- The standard single page application form completed and signed by the applicant,
- A signed copy of the standardized contract,
- A three line diagram for the system identifying the manufacturer and model number of the equipment(s),
- A copy of the manufacturer’s data sheet for the equipment(s),
- A copy of the manufacturers verification test
procedure(s) and
- A copy of the equipment(s) certification to UL 1741 (November 2005 revision) if applicable.
|
Application for distributed generation projects 25 kw or less |
| OR |
|
|
2 b. If you are installing a system that will generate more than 25 kw, you must apply using this form (we are unable to accept online applications, but once you apply, you can create a secure login ID to check your project status).
Remember to include this information with your application:
- A copy of equipment certification to UL 1741 (November 2005 revision) as applicable,
- A three-line diagram specific to the proposed system,
- A letter of authorization (if you are an agent for the customer), and
- Payment of a non-refundable $350 application fee (the fee shall be refunded unless applied toward the cost of installing a dedicated transformer).
|
Application for distributed generation projects greater than 25 kw |
Mailing Address for Your Application
James A. Carrigg Center, Kirkwood P.O. Box 5224 18 Link Drive Kirkwood Industrial Park Binghamton, NY 13902-5224
Attention: T. Donnelly / M. Chier
|