Applications and Instructions

Whether you need more information or are ready to apply, you can find what you need here. To view these files, you need Adobe Acrobat Reader. You can download the latest version for free at this link.

The New York State Public Service Commission (PSC) has a section of their Web site dedicated to distributed generation projects.
You can click here to access PSC information and resources.

Select the appropriate form(s) below for your distributed generation project

Distributed Generation Project Size and Status  Required  Forms
1.    If your site requires new or upgraded electric service Application for electric service

2 a. If you are installing a system that will generate 25 kw or less
        you can apply online or download this form.

        Remember to include the following information with
        your application:

  1. A letter of authorization by the customer (if you are
    acting as an agent for the customer),
  2. The standard single page application form completed and signed by the applicant, 
  3. A signed copy of the standardized contract, 
  4. A three line diagram for the system identifying the manufacturer and model number of the equipment(s), 
  5. A copy of the manufacturer’s data sheet for the equipment(s), 
  6. A copy of the manufacturers verification test
    procedure(s) and
  7.  A copy of the equipment(s) certification to UL 1741 (November 2005 revision) if applicable.
Application for distributed generation projects 25 kw or less
OR  

2 b. If you are installing a system that will generate more than
        25 kw
, you must apply using this form (we are unable to
        accept online applications, but once you apply, you can
        create a secure login ID to check your project status).

        Remember to include this information with your application:

  1. A copy of equipment certification to UL 1741 (November 2005 revision) as applicable, 
  2. A three-line diagram specific to the proposed system, 
  3. A letter of authorization (if you are an agent for the customer), and
  4. Payment of a non-refundable $350 application fee (the fee shall be refunded unless applied toward the cost of installing a dedicated transformer).
Application for distributed generation projects greater than 25 kw


Mailing Address for Your Application

     James A. Carrigg Center, Kirkwood
      P.O. Box 5224
      18 Link Drive
      Kirkwood Industrial Park
      Binghamton, NY 13902-5224

      Attention: T. Donnelly / M. Chier