Online Portal

Online Application

As of October 2018, all NYS SIR DER applications and documentation are required to follow the new SIR document issued in October 2018. A copy of the SIR (October 2018) document can be found on the NYS PSC Distributed Generation Information website.

Be sure to include all the necessary information with your application for fastest review and processing. We have listed the general requirements. For more detail, you can visit the New York State Public Service Commission (PSC) website dedicated to distributed generation projects: access to the PSC website.

Once you have submitted your application, you can view your status online via a secure Login ID

An applicant proposing a hybrid project or stand-alone ESS shall complete Appendix K and upload via B or C as applicable.

Applying Online

Distributed Generation Project Status Required Forms
1. If your site requires new or upgraded service. Application for service

2. If you are installing a system that will generate 5 mw or less.

Pre-application, application and review status for distributed generation projects. Login to online portal.
3. Ensure your application is accompanied by the following information. For hybrid or ESS, include Appendix K.

Pre-applications or applications more than 50 kw in size, payment of a non-refundable $750 application fee.

4. New York State Standardized Acknowledgment of Property Owner Consent Form Owner consent form


FAQs

  • How can I save more on my air conditioning costs?  
  • Is it really beneficial for me to switch to LED or CFL light bulbs?  
  • How can I save on energy around my home?  
  •  
  • Does NYSEG offer energy efficiency programs?